Warsan Development has two main phases, Phase (1) is consisting of more than 900 townhouses, while phase (2) has about 2 km strip of retail and townhouses.
the retails and townhouses buildings are connected through Steel Struss Bridges designed to facilitate the circulation between building without any abstraction to road traffic.
The Project is completely constructed and occupied
YMA Founder was leading the structural design of the entire project as a Lead Structural Engineer and Head of Structural Engineering of AE7 and managed structural design, local authorities and construction on a daily basis.