The project comprises (3) Basements, Ground, Mezzanine, (7) Typical Residential Floors, Roof, and Top Roof.
YMA has been appointed by the Main Contractor to conduct structural redesign and Value Engineering for the Building to achieve the optimum structural design solutions complying with the local authorities’ regulations.