Bridges

Lagoon vehicular bridge District (1), MBR City

Dubai, UAE

102m Post-Tension Multi Cell Concrete Box Girder.

The bridge consists of two traffic lanes and divided into three span 30, 42, and 30m. The bridge is crossing Crystal Lagoon of District (1) and supported on concrete piers / abutment.
The bridge allow for pedestrian to walk on the two sides to cross the Crystal Lagoon.

The Project is completely constructed and occupied.

YMA Founder was leading the structural design of the bridge as a Lead Structural Engineer and Head of Structural Engineering at AE7 and managing authorities’ approvals and provide technical support during construction stage.

Our Work

Related Bridges