Bridges

International coastal road sector 3b Al Salam canal bridge

Egypt

The 780m long twin bridges consist of 3 different sections: 525m reinforced concrete box girder bridge, 35m composite steel multi-girder bridge, 150m composite box steel girder bridge ( 3 Continuous Spans), and 70m slab-on-pile approach system.

​YMA Founder was involved in the design verifications, design of bridge decking, stiffeners’ design, expansion joints, approach slab, construction methodology, load test, and review shop drawings at EHAF.

Our Work

Related Bridges