Bridges

Building material city Footbridge (1)

Abu Dhabi, UAE

The project is a cable stayed steel pedestrian bridge over the main road between Residential areas and Shopping Mall. The bridge provides also passage for the fire engines in case of emergency.

The bridge exhibits light structural solution , more clear height underneath the bridge deck, and rapid construction with minimum interference with infra-structure and Road Contractor underneath.

The total length of the bridge is about 70m divided into two semi equal spans. The main steel girders are built up I section connected with the bridge deck by using studs as flexible shear connector.

The central tower of “A” shape is hollow steel box section of 22m height. The bridge deck is RC slab supported on the secondary steel beams using steel metal decking. The structural of the bridge is covered by metal cladding to be elegance over the road.

YMA Founder was leading the bridge design and local authorities’ approvals whilst employed at EHAF.

Our Work

Related Bridges